Guide

How to import garments from India

Importing garments from India follows six steps: enquiry, costing, sample approval, production, inspection and shipment with export documents. The Incoterm decides who pays freight and where risk passes; the payment term decides who carries the financial risk. Ready stock skips sampling and production and can ship sooner.

Published
2026-11-04
Updated
2026-11-08
By
GoodBiz Apparels sourcing team
Sections
8

The six steps and typical timelines

Ready stock skips steps 3 and 4: you approve photos of the actual lot and it ships once paid. Timings are typical ranges, not commitments; the proforma invoice gives your lead time.

StepWhat happensTypical time
1. EnquiryYou share products, quantities, spec or tech pack, and destination portGoodBiz replies within 24 hours, Monday to Saturday
2. Costing and proforma invoicePrice, Incoterm, payment terms and lead time are confirmedOften a few days
3. Sample approvalA sample is made to your spec and approved in writingCommonly 1 to 3 weeks per round
4. ProductionFabric is sourced to your GSM, then cut, sewn, finished and packedCommonly 4 to 10 weeks, depending on fabric and quantity
5. InspectionQuantity, measurements, workmanship and packing are checkedUsually 1 to 2 days
6. ShipmentExport clearance in India, then sea or air freightSea often 1 to 3 weeks to the Gulf and 3 to 6 weeks or more to Europe, the UK or North America; air usually under a week

Export documents you receive

DocumentWhat it does and when you need it
Commercial invoiceValue, currency, Incoterm and HSN code per line. Every shipment
Packing listCartons, sizes, quantities, weights and dimensions. Every shipment
Ocean bill of ladingReceipt and contract of carriage. Only an original, negotiable bill of lading is a document of title, letting its holder claim the goods. Used with letters of credit and D/P
Sea waybill or telex releaseThe goods are released to the named consignee without original documents. Suits advance or open account payment
Air waybillReceipt and contract of carriage for air freight. It is not negotiable and not a document of title
Certificate of originNeeded to claim preferential duty under a trade agreement. A non-preferential certificate is issued when a buyer, bank or customs authority asks for proof of origin
Insurance certificateWhen the seller insures, as under CIF or CIP
Inspection certificate or test reportWhen the contract, letter of credit or destination requires it

The exporter also files a shipping bill, the Indian export declaration. Request any certificate of origin before the goods ship; it is applied for on DGFT's online platform.

Incoterms 2020 compared

An Incoterm sets who pays for transport, who clears customs and where risk passes. It does not set when ownership passes or how you pay. Write the rule, place and version, for example "FOB Chennai, Incoterms 2020".

TermMain freight paid byRisk passes to buyerModeBest for
EXW (Ex Works)BuyerGoods made available at the seller's premises, not loadedAnyBuyers with an agent in India; the buyer must handle Indian export clearance
FCA (Free Carrier)BuyerGoods handed, export cleared, to the buyer's carrier at the named placeAnyContainers and air freight; ICC suggests FCA instead of FOB for containers
FOB (Free On Board)BuyerGoods on board the vessel at the port of shipmentSea onlySea freight; still common for containers
CFR (Cost and Freight)Seller, to destination portOn board the vessel at the port of shipmentSea onlySeller books sea freight, buyer insures
CIF (Cost, Insurance and Freight)Seller, plus insuranceOn board the vessel at the port of shipment, even though the seller pays freight and insurance to your portSea onlyA price to your port; minimum cover is Institute Cargo Clauses (C) for 110 percent of the contract price
DAP (Delivered at Place)SellerAt the named destination, ready for unloadingAnyDelivery to your premises; you clear import and pay duty
DDP (Delivered Duty Paid)Seller, including duty and taxesAt the named destination, ready for unloadingAnyRare for garments; the seller must clear customs in your country

CPT and CIP are the any-mode versions of CFR and CIF; CIP requires broader Institute Cargo Clauses (A) cover. Incoterms 2020 also lets an FCA buyer have its carrier issue an on-board bill of lading for a letter of credit.

Payment terms

The payment term, stated on the proforma invoice, decides who carries the financial risk.

TermHow it worksRisk to the buyerRisk to the seller
Advance T/TBank transfer before shipment. Common practice for made to order is a deposit of 30 to 50 percent with the order and the balance before dispatch or against a copy of the bill of ladingHigh: you pay before receiving the goodsLow
Letter of credit at sight (UCP 600)Your bank pays when documents complying with the credit are presented. Banks deal with documents, not goodsYou pay on compliant documents even if the goods disappoint, so require an inspection certificateLow if the documents comply; discrepancies can lose the bank's undertaking
D/P, documents against payment (URC 522)Your bank releases the shipping documents when you payModerate: you pay before inspectingNo bank guarantee; unpaid goods sit at the port. Gives control only with an original, negotiable bill of lading
D/A, documents against acceptance (URC 522)You get the documents by accepting a bill of exchange payable later, such as at 60 or 90 daysLowHigh: goods shipped on credit with no bank guarantee

Confirm any change of bank details by phone before paying; email payment fraud is a real risk.

Inspection and AQL sampling

Most buyers inspect before paying the balance. The final random inspection is commonly done when production is complete and at least 80 percent is packed.

It usually samples under ISO 2859-1: the lot size and inspection level give a sample size, and defects found are compared with the acceptance number for the agreed acceptance quality limit (AQL). Common practice in apparel is general inspection level II with:

  • Critical defects (safety, such as a broken needle in a garment): none accepted.
  • Major defects (likely returns, such as a broken seam or a stain): AQL 2.5.
  • Minor defects (such as an untrimmed thread): AQL 4.0.

Example: a 5,000 piece lot at level II gives a 200 piece sample. At AQL 2.5 it passes with up to 10 major defects and fails at 11; at AQL 4.0 it passes with up to 14 minor defects. ISO 2859-1 was revised in 2026, so name the edition, level and AQLs in your order.

Landed cost: a worked example

Landed cost = FOB value + international freight + insurance + import duty + other import charges, where import duty = duty rate × customs value.

The EU and the UK include freight and insurance to the border in the customs value; the USA leaves out international freight and insurance. Your broker confirms the basis and rate. The figures below are illustrative, not GoodBiz prices or freight quotes, and 12 percent is an example duty rate, not a real one.

ItemEU or UK basisUS basis
FOB value, 5,000 pieces20,00020,000
Sea freight1,5001,500
Insurance100100
Customs value21,60020,000
Duty at an example 12 percent2,5922,400
Other charges (broker, terminal, delivery)900900
Landed cost25,09224,900
Per piece5.024.98

Import VAT or GST is left out, as registered businesses can often recover it.

How to check an Indian supplier

  • IEC: Indian exporters need an Import Export Code from the Directorate General of Foreign Trade (DGFT). Check it with View Any IEC on the DGFT website.
  • GSTIN: use Search Taxpayer on the GST portal. The legal name should match the invoice and the status should be active.
  • RCMC: apparel exporters claiming Foreign Trade Policy benefits hold a Registration-cum-Membership Certificate from the Apparel Export Promotion Council (AEPC), now issued through DGFT's e-RCMC system. Ask for a copy and check the dates.
  • Bank account: the name should match the IEC and GSTIN.
  • Who makes the goods: ask whether production is in-house or through partner factories. GoodBiz works through partner garment factories in India and runs the spec, sampling, quality checks, labelling, documents and shipping itself.

HSN codes and market rules

Each line is declared with an 8 digit HSN code. The first 6 digits are shared internationally, so your broker can start from them, but your country's tariff sets the final code and rate. See HSN codes for garments.

  • USA: fibre and care labelling, children's product rules, and an Importer Security Filing for ocean cargo 24 hours before loading.
  • UK: fibre composition labelling.
  • European Union: fibre labels in the local language and REACH chemical limits.
  • UAE and GCC: CEPA preference with a certificate of origin.
  • Africa: PVoC or SONCAP conformity in some markets.
  • Australia: mandatory care labelling, and ECTA preference with a certificate of origin.

See all export markets. General guidance, not legal or customs advice.

Sources and official links

FAQ5 answers

Questions buyers ask

Anything else? Send us your question.

How long does it take to import garments from India?

Ready stock can ship once payment and documents are in order. Made to order adds sampling, production and transit time; your supplier confirms the lead time in the proforma invoice.

Which Incoterm is best for a first order?

FOB is the most familiar for sea freight. For containers and air, FCA does the same job at the point where the goods are actually handed over, which is why ICC suggests it.

Is an air waybill a document of title?

No. An air waybill is a receipt and contract of carriage, and the airline releases the goods to the named consignee. Only an original, negotiable ocean bill of lading is a document of title.

What does AQL 2.5 mean in garment inspection?

It is the acceptance quality limit commonly used for major defects. For a 5,000 piece lot at level II, ISO 2859-1 tables give a 200 piece sample that passes with up to 10 major defects.

Do I need a certificate of origin?

Only to claim reduced duty under a trade agreement, or when your customs, bank or buyer asks for proof of origin. Request it before shipment.

Next step

Ready to source?

Send your spec or ask what is in stock. We reply with availability or a production costing. We reply within 24 hours, Monday to Saturday.

Send your enquiry